What Is the Process After Requesting a Title 24 Report?
Call (626) 365-1518 | Alternative Energy Systems
Requesting a Title 24 report begins a professional review process rather than an instant document-generation step. What Is the Process After Requesting a Title 24 Report is an important question for homeowners, contractors, architects, designers, developers, property managers, and business owners who need California energy-compliance documentation for a permit project.
After the initial request, Alternative Energy Systems reviews the project description and available plans to determine what type of analysis is needed. AES may then request additional information involving windows, insulation, roofing, HVAC equipment, ducts, ventilation, water heating, commercial lighting, controls, or other energy-related features.
Once the required information is available, AES completes the applicable energy calculations, evaluates the proposed compliance measures, prepares the necessary forms, and helps identify the information that must remain coordinated with the construction plans.
The process may also include a project-specific quote, payment instructions, design clarifications, revisions, or assistance with building-department correction comments.
Alternative Energy Systems brings more than 30 years of California energy-compliance experience to residential, multifamily, mixed-use, and commercial permit projects. Call (626) 365-1518 to request a report, submit your plans, or ask what happens next for your specific project.
What Is the Process After Requesting a Title 24 Report From AES?
The general process includes the following stages:
- Project request and initial intake
- Scope and document review
- Request for missing or conflicting information
- Quote, authorization, and payment instructions
- Energy calculations and compliance review
- Preparation of the applicable forms
- Coordination with the current plan set
- Delivery of the completed documentation
- Revisions or correction support when required
The exact workflow depends on the project.
A detached ADU does not necessarily follow the same calculation path as a commercial restaurant improvement. A residential addition may require coordination with an existing home, while a commercial tenant improvement may involve separate architectural, mechanical, electrical, lighting, and control documents.
AES reviews the actual project before defining the complete scope.
Step 1: AES Receives the Initial Request
The process begins when the client contacts Alternative Energy Systems and describes the proposed work.
The initial request may be made by:
- A homeowner
- A property owner
- A contractor
- An architect
- A building designer
- A developer
- A property manager
- A business owner
- An authorized project representative
The request should identify the basic project type and explain why the report is needed.
Projects may include:
- New residential construction
- New commercial construction
- An attached or detached ADU
- A garage conversion
- A room addition
- A second-story addition
- A residential remodel
- A multifamily improvement
- A commercial tenant improvement
- An HVAC replacement
- A lighting or lighting-control project
- A plan-check correction response
- A revision to an existing report
A brief description such as “I need Title 24” may start the conversation, but AES will need more information before determining the service, price, and schedule.
Information to Include in the Initial Request
Provide:
- Project address
- Permit jurisdiction
- Residential or commercial property type
- Description of the proposed work
- Approximate project size
- Current design stage
- Requested completion date
- Primary contact person
- Whether plans are available
- Whether a previous report exists
- Whether correction comments have been issued
This information helps AES understand what should be reviewed first.
Step 2: The Project Scope Is Confirmed
After the request is received, AES evaluates the stated scope.
The project scope determines:
- Whether the work is residential or nonresidential
- Whether it involves new construction or an alteration
- Which building areas are conditioned
- Which building components are affected
- Which mechanical or lighting systems are involved
- Which calculations may apply
- Which compliance forms may be required
The scope must be clear because Title 24 documentation is tied to the proposed work.
For example, a residential remodel that replaces interior finishes may have a different energy scope from a remodel that changes exterior walls, windows, insulation, roofing, HVAC equipment, and conditioned floor area.
A commercial lighting alteration may have a different scope from a complete tenant improvement that also modifies ventilation, mechanical equipment, service water heating, and the building envelope.
Why Scope Confirmation Matters
An incomplete scope can affect:
- The project quote
- The required plans
- The calculation method
- The applicable forms
- The turnaround estimate
- The need for later revisions
Describe the complete proposed work before the analysis begins.
Step 3: The Current Plans Are Submitted
AES generally needs the current construction documents before completing the project review.
Whenever possible, submit one clearly identified PDF plan set rather than numerous separate sheets with unclear filenames.
The plan set may include:
- Cover sheet and project data
- Site plan
- Existing floor plans
- Proposed floor plans
- Exterior elevations
- Building sections
- Roof plan
- Wall, roof, ceiling, and floor details
- Window and exterior-door schedules
- Mechanical plans
- Electrical and lighting plans
- Equipment schedules
- Relevant construction notes
The plans should be readable and should represent the current design.
If several versions exist, identify which file AES should use.
Use Clear Filenames
A useful filename might include:
- Project address
- Document type
- Plan or revision date
For example:
- 123-Main-Street-Current-Plans-2026-08-04.pdf
- 123-Main-Street-Window-Schedule.pdf
- 123-Main-Street-HVAC-Specifications.pdf
Avoid filenames such as:
- Final-Plans.pdf
- Final-Plans-2.pdf
- New-Attachment.pdf
- Scan0001.pdf
Clear filenames help reduce confusion when plans are revised.
Step 4: AES Reviews the Plans and Specifications
AES examines the available documents to determine whether the project contains the information needed for the energy analysis.
The review may address:
- Conditioned floor area
- Building orientation
- Wall construction
- Roof and ceiling assemblies
- Floor assemblies
- Insulation values
- Window sizes and locations
- Window performance
- Exterior doors
- Roofing characteristics
- HVAC equipment
- Duct locations
- Ventilation systems
- Water-heating equipment
- Residential lighting measures
- Commercial lighting and controls
The purpose of this stage is to understand the actual building design and identify whether the plans are coordinated.
Existing and Proposed Work Must Be Clear
For additions, remodels, garage conversions, and attached ADUs, the plans should distinguish:
- Existing conditioned space
- Existing unconditioned space
- New conditioned space
- Removed construction
- New walls and openings
- Existing systems that remain
- New or replaced equipment
Unclear project boundaries can delay the analysis or cause the wrong building area to be evaluated.
Step 5: Missing or Conflicting Information Is Identified
After the initial plan review, AES may send questions or request additional documents.
Common missing items include:
- Window dimensions
- Window U-factors
- Window solar heat gain coefficients
- Exterior-door specifications
- Wall insulation
- Roof insulation
- Ceiling and attic details
- HVAC system type
- Heating and cooling efficiencies
- Duct-location information
- Ventilation specifications
- Water-heating information
- Commercial fixture wattage
- Lighting-control details
Conflicting information may also require clarification.
Examples include:
- Floor areas that differ between sheets
- Window schedules that do not match elevations
- Mechanical equipment that differs between the notes and schedules
- Insulation values that differ between sections and details
- Lighting schedules that do not match the electrical plans
AES can identify the conflict, but the architect, designer, contractor, engineer, owner, or supplier may need to provide the final design decision.
Step 6: The Client Responds to Information Requests
The project can move forward when the missing details are supplied.
Responses should be based on updated plans, schedules, or product specifications rather than informal guesses.
When an item remains undecided, state that clearly.
For example:
- The final windows have not been selected
- The HVAC model is pending
- The architect is revising the roof assembly
- The lighting designer is updating the control plan
- The contractor is confirming the duct location
This allows AES to distinguish between confirmed project information and pending design decisions.
Who Should Answer Technical Questions?
The appropriate contact may be:
- The architect
- The building designer
- The mechanical engineer
- The electrical designer
- The contractor
- The equipment supplier
- The owner
Identify the person authorized to make or confirm design decisions.
Step 7: The Quote and Service Scope Are Confirmed
AES can provide a project-specific quote after enough information is available to understand the work.
The quote may consider:
- Project type
- Building size
- Calculation complexity
- Plan completeness
- Number of building systems
- Requested turnaround
- Previous reports
- Design revisions
- Plan-check corrections
Review the quote for:
- Project address
- Service description
- Calculation scope
- Expected forms or deliverables
- Turnaround information
- Revision terms
- Correction-response terms
- Payment amount
- Payment instructions
Do not assume that every project includes unlimited revisions, expedited scheduling, third-party testing, permit fees, or all future correction cycles.
Review Title 24 report pricing in California for additional pricing information.
Step 8: Payment Is Completed When Arranged
Payment should follow the instructions provided for the specific project.
When the service and amount have already been arranged, payment may be completed through the AES payment page.
Before paying, confirm:
- Client name
- Project address
- Approved amount
- Service being purchased
- Applicable quote or invoice
- Payment deadline
The payment page should not replace the initial quote and project-review process.
Call (626) 365-1518 when the amount or payment timing has not been confirmed.
Step 9: AES Completes the Energy Calculations
Once the necessary information is available and the project has been authorized, AES can complete the applicable energy analysis.
The calculations may evaluate:
- Building geometry
- Conditioned floor area
- Building orientation
- Wall, roof, ceiling, and floor assemblies
- Insulation values
- Window area and performance
- Exterior doors
- Heating and cooling equipment
- Duct locations
- Ventilation
- Water heating
- Residential lighting measures
- Commercial lighting power
- Lighting-control systems
The required calculations depend on the occupancy, project scope, construction details, and applicable compliance approach.
For more information, review the Title 24 energy calculations page.
Step 10: The Proposed Design Is Evaluated
The analysis determines whether the proposed building features support the applicable compliance requirements.
The project may move directly to form preparation when the design and documentation are sufficient.
In other cases, the analysis may identify an issue requiring clarification or adjustment.
Potential areas of review include:
- Window performance
- Window area
- Insulation values
- Roof construction
- HVAC efficiency
- Duct location
- Water-heating equipment
- Commercial lighting power
- Lighting controls
AES can explain which part of the design requires attention. The project team then determines which practical change should be incorporated into the plans.
Design Changes May Require Additional Review
A change made during the calculation stage may affect several parts of the report.
For example:
- Resizing windows may change the envelope analysis
- Selecting different HVAC equipment may change mechanical information
- Changing the roof assembly may affect insulation and roofing measures
- Changing commercial fixtures may affect lighting-power calculations
Send revised information promptly so AES does not continue using an outdated design.
Step 11: The Compliance Forms Are Prepared
After the energy analysis is completed, AES prepares the applicable project-specific forms.
The documentation may identify:
- Project information
- Building characteristics
- Envelope measures
- Window performance
- Mechanical systems
- Ventilation
- Water heating
- Lighting measures
- Control requirements
- Applicable verification measures
The exact forms depend on the project type and scope.
A new home, addition, commercial tenant improvement, HVAC alteration, and lighting project may use different documentation.
Step 12: The Report Is Coordinated With the Plans
The report and plans must describe the same project.
AES may identify measures that should appear in the construction documents. The architect, designer, contractor, or responsible project professional should confirm that the plan set reflects those requirements.
Review the documents for consistency involving:
- Project address
- Conditioned floor area
- Window sizes
- Window performance
- Insulation
- Roof characteristics
- HVAC equipment
- Duct locations
- Ventilation systems
- Water-heating equipment
- Commercial lighting
- Lighting controls
A technically correct report based on an old plan set may still create a permit problem.
The report does not replace the construction plans. It works with them as part of the permit package.
Step 13: The Completed Report Is Delivered
After the calculations, forms, and coordination review are complete, AES provides the project documentation according to the arranged service.
The client should review the delivered files for:
- Correct project address
- Correct client or project identification
- Current plan version
- Expected forms
- Identified energy measures
- Any notes requiring plan updates
Report any obvious project-identification issue promptly.
The architect, designer, contractor, owner, or permit coordinator can then incorporate the documentation into the broader permit-submittal package.
What Happens After the Report Is Delivered?
Delivery of the report does not necessarily end the project’s complete permit process.
The next steps may include:
- Adding the forms to the permit package
- Updating plan notes and schedules
- Submitting the package to the building department
- Responding to plan-check comments
- Updating the report after design revisions
- Coordinating field-verification requirements
The exact responsibility for submission should be confirmed with the project team.
The architect, designer, contractor, owner, or permit coordinator may be responsible for submitting the complete plans.
Does AES Submit the Permit Package?
Preparing a Title 24 report does not automatically mean that AES submits the entire building-permit application or acts as the project’s permit expediter.
The complete permit package may include:
- Architectural plans
- Structural documents
- Mechanical plans
- Electrical plans
- Plumbing plans
- CALGreen documentation
- Title 24 forms
- Jurisdictional applications
Confirm who is responsible for:
- Uploading the complete plans
- Paying permit and plan-check fees
- Tracking the application
- Receiving correction comments
- Coordinating responses from each design professional
Do not assume that these administrative services are included unless the written proposal states otherwise.
What Happens if the Building Department Issues Corrections?
The building department may request clarification or identify a conflict involving the energy documentation.
Energy-related comments may involve:
- Missing forms
- Inconsistent window information
- Missing insulation notes
- Mechanical-equipment discrepancies
- Ventilation questions
- Water-heating information
- Commercial lighting power
- Lighting controls
- Differences between the report and plans
Send AES:
- The complete correction notice
- The latest architectural plans
- Current mechanical plans
- Current electrical and lighting plans
- The previously submitted report
- Updated product specifications
- A written summary of revisions already made
AES can review the complete package and determine whether the response requires a clarification, revised calculation, updated form, or change to the plans.
What Happens if the Plans Change After the Report?
The report may need to be revised when the design changes.
Updates may be necessary when the project changes:
- Conditioned floor area
- Building geometry
- Window sizes
- Window performance
- Insulation
- Roofing
- HVAC equipment
- Duct locations
- Ventilation
- Water heating
- Commercial lighting
- Lighting controls
- The overall permit scope
Submit:
- The previous report
- The latest plan set
- Updated specifications
- A written change summary
- The requested revision date
A report based on superseded plans should not be submitted with the revised permit set.
What Is the Process After Requesting a Title 24 Report for an ADU?
The ADU process follows the same general workflow, but the project documents must identify whether the unit is detached, attached, or converted from existing space.
AES may need:
- ADU floor plan
- Exterior elevations
- Building sections
- Roof plan
- Window and exterior-door schedule
- Insulation details
- HVAC specifications
- Ventilation information
- Water-heating details
For an attached ADU or garage conversion, the plans should distinguish existing construction from the new conditioned living area.
The process may involve:
- Reviewing the ADU scope
- Confirming the existing and proposed areas
- Reviewing windows and envelope assemblies
- Reviewing HVAC, ventilation, and water heating
- Completing the residential calculations
- Preparing the applicable forms
- Coordinating the measures with the ADU plans
Visit the ADU Title 24 page for related information.
What Is the Process for an Addition or Remodel?
For an addition or remodel, AES must understand what exists and what will change.
The plans should identify:
- Existing conditioned space
- New conditioned space
- Removed and proposed walls
- New or replaced windows
- New insulation
- Roof and ceiling alterations
- Existing or new HVAC systems
- Duct extensions
- Ventilation changes
- Water-heating changes
The report process may be delayed when the existing and proposed conditions are not clearly separated.
A remodel should also identify whether the work is cosmetic or affects energy-related building components.
What Is the Process After Requesting a Commercial Title 24 Report?
Commercial projects may require coordination among several design disciplines.
AES may review:
- Architectural plans
- Building-envelope details
- Mechanical plans
- HVAC equipment schedules
- Ventilation information
- Service water-heating information
- Electrical plans
- Lighting fixture schedules
- Lighting-control plans
Commercial projects may include:
- New nonresidential buildings
- Office tenant improvements
- Retail build-outs
- Restaurant improvements
- Warehouse alterations
- Mixed-use projects
- Commercial HVAC replacements
- Interior lighting projects
- Exterior lighting projects
- Multifamily common-area improvements
The process may require questions to be directed to separate architectural, mechanical, electrical, plumbing, or lighting contacts.
For related services, review Title 24 compliance services and Title 24 energy analysis.
Does the Process Include HERS Testing?
The Title 24 report may identify measures requiring field testing or verification.
The consultant prepares the energy analysis and applicable forms. Field testing or verification is completed separately by the appropriate professional.
The report process does not automatically include:
- Duct-leakage testing
- Airflow verification
- Refrigerant-charge verification
- Fan testing
- Construction inspections
- Other field-verification services
Not every project has the same verification requirements.
The completed report can help the project team identify which measures may apply during construction.
Review Title 24 vs. CALGreen for additional information about overlapping compliance subjects.
How Long Does the Process Take?
Turnaround depends on:
- Project type
- Building size
- Building geometry
- Calculation complexity
- Completeness of the plans
- Availability of specifications
- Response time for missing information
- Requested design changes
- Plan-check corrections
- Requested priority scheduling
A coordinated project with complete information can generally move more efficiently than one requiring repeated clarification.
The total calendar time may include periods when AES is waiting for:
- Updated plans
- Window information
- Insulation details
- Equipment selections
- Lighting schedules
- Answers from the project team
Call (626) 365-1518 to discuss a schedule based on the actual project.
How Can You Keep the Process Moving?
Clients can reduce avoidable delays by following several practical steps.
Submit One Current Plan Set
Clearly identify the current file and avoid sending several superseded versions without explanation.
Provide a Complete Scope
Explain every energy-related part of the proposed work.
Include Available Specifications
Submit window, insulation, HVAC, ventilation, water-heating, lighting, and control information when available.
Identify Pending Decisions
Tell AES which products or systems remain undecided.
Respond Promptly
Direct technical questions to the correct architect, designer, contractor, engineer, or supplier.
Report Design Changes Early
Do not wait until the report is complete to disclose major revisions.
Send Complete Correction Notices
Provide the entire notice and the latest plan set rather than one isolated comment.
Common Problems That Interrupt the Process
Frequent issues include:
- No clear project description
- Missing floor plans
- Conflicting square footage
- Several unidentified plan versions
- Window schedules that do not match the elevations
- Missing window performance values
- Undefined insulation assemblies
- Unclear roof construction
- Undecided HVAC equipment
- Missing duct information
- Incomplete ventilation details
- Missing water-heating specifications
- Incomplete commercial lighting schedules
- Missing lighting controls
- Repeated design changes
- Correction notices submitted without current plans
Providing a large number of files does not necessarily create a complete submission. The documents must be current, readable, relevant, and coordinated.
Why Choose Alternative Energy Systems?
Alternative Energy Systems provides professional Title 24 report and energy-calculation support for homeowners, contractors, architects, designers, developers, property managers, and commercial clients throughout California.
AES brings more than 30 years of experience to:
- New residential construction
- New commercial construction
- ADUs and garage conversions
- Additions and remodels
- Multifamily improvements
- Commercial tenant improvements
- HVAC and lighting projects
- Plan-check corrections
- Revisions to existing reports and calculations
AES reviews the actual project, identifies the information needed, completes the applicable analysis, prepares the forms, and helps coordinate the energy documentation with the current plans.
Learn more on the About Us page or review the company’s professional background on the clients page.
Request Your Title 24 Report From AES
Call (626) 365-1518 | Alternative Energy Systems
Understanding What Is the Process After Requesting a Title 24 Report helps you prepare for each stage: project intake, plan review, missing-information requests, quote approval, payment, calculations, form preparation, plan coordination, delivery, and possible revisions.
Alternative Energy Systems can review your residential or commercial project, identify the required information, prepare the applicable analysis, and help move the energy-compliance package toward permit submittal.
Call (626) 365-1518 to:
- Describe your project
- Submit the current plans
- Ask what information is still needed
- Request a project-specific quote
- Discuss the anticipated turnaround
- Request help with plan-check corrections
- Request revisions to an existing report
You may also begin through the contact page. When the service and payment amount have already been arranged, payment can be completed through the AES payment page.
- Phone: (626) 365-1518
- Email: info@title24energy.com
- Payment: AES Payment
Do not wait until the intended permit-submittal date to begin the energy-compliance process. Call Alternative Energy Systems at (626) 365-1518 and request a professional review of your current project plans.
Frequently Asked Questions: What Is the Process After Requesting a Title 24 Report?
What Is the Process After Requesting a Title 24 Report?
AES reviews the project scope and plans, identifies missing information, confirms the service, completes the applicable energy calculations, prepares the forms, and helps coordinate the report with the current plan set.
What happens immediately after I contact AES?
AES needs basic information about the property, proposed work, current design stage, permit jurisdiction, requested schedule, and available plans.
Do I need to submit plans before receiving a report?
Yes. Project-specific calculations and forms generally require current plans and applicable building-system information.
What documents should I send?
Helpful documents include floor plans, elevations, sections, roof plans, window schedules, insulation details, HVAC specifications, ventilation, water heating, commercial lighting plans, and correction notices when applicable.
What happens if information is missing?
AES can identify the missing details and explain what must be provided before the calculations or final forms can be completed.
Who answers technical questions?
The architect, designer, contractor, engineer, owner, or equipment supplier may need to answer questions depending on the subject.
When is the project quote prepared?
A meaningful quote can be prepared after AES has enough information to understand the project scope, calculation complexity, documents, requested schedule, and revision needs.
When do I pay?
Payment should follow the project-specific quote or invoice. The AES payment page may be used after the service and amount have been arranged.
What happens during the calculation stage?
AES evaluates the applicable building envelope, windows, HVAC systems, ducts, ventilation, water heating, lighting, controls, and other project-specific energy features.
What happens if the design does not work as proposed?
AES can identify the area requiring attention. The project team can then determine which practical design adjustment should be made.
What happens after the calculations are completed?
AES prepares the applicable forms, reviews the project information, and identifies measures that should remain coordinated with the permit plans.
Does AES prepare the architectural plans?
The energy report works with the architectural plans. Complete architectural design or drafting should not be assumed unless separately arranged.
Does AES submit the entire permit package?
Not automatically. Confirm whether the architect, designer, contractor, owner, or permit coordinator is responsible for submission.
What happens if the building department issues corrections?
Send AES the complete correction notice, latest plans, previous report, updated specifications, and a summary of changes already made.
What happens if the plans change?
The report may need to be revised so the calculations and forms remain aligned with the current design.
Does the process include HERS testing?
The report may identify field-verification measures, but testing and inspections are separate services performed by the appropriate professional.
How long does the process take?
Timing depends on project type, complexity, plan completeness, available specifications, response time, revisions, and correction requirements.
Does receiving the report guarantee permit approval?
No. The report supports the energy-compliance portion of the permit package, but the complete project remains subject to building-department review.
How do I get started?
Call Alternative Energy Systems at (626) 365-1518, describe the project, and submit the current plans for review.







