How Do I Order a Title 24 Report?

How Do I Order a Title 24 Report

How Do I Order a Title 24 Report?

Call (626) 365-1518 | Alternative Energy Systems

If you are preparing plans for a California permit project and asking How Do I Order a Title 24 Report, the process begins with your project information—not with purchasing a generic document. A Title 24 report must be prepared around the actual building, current plans, proposed systems, and permit scope.

Alternative Energy Systems reviews the available project documents, identifies the information needed for the energy analysis, prepares the applicable calculations and compliance forms, and helps coordinate those requirements with the current plan set.

The basic ordering process is:

  1. Contact Alternative Energy Systems
  2. Describe the project and permit scope
  3. Send the current plans and available specifications
  4. Allow AES to review the project
  5. Provide any missing information
  6. Review the project-specific quote and scope
  7. Arrange service and complete payment as instructed
  8. AES prepares the calculations and applicable forms
  9. Coordinate the report with the permit drawings
  10. Receive the completed documentation and address later revisions when necessary

AES brings more than 30 years of California energy-compliance experience to residential, multifamily, mixed-use, and commercial projects.

Call (626) 365-1518 to begin, or use the contact page to provide information about your project.

How Do I Order a Title 24 Report From Alternative Energy Systems?

Ordering begins by giving AES enough information to understand what you are building or changing.

You do not need to know every technical requirement before making contact.

Start with the basics:

  • Project address
  • Residential or commercial property type
  • Description of the proposed construction
  • Approximate project size
  • Permit jurisdiction when known
  • Current design stage
  • Whether plans are available
  • Whether a previous Title 24 report exists
  • Whether the building department has already issued corrections
  • Requested completion date

AES can then determine which additional documents are useful and whether enough information is available to quote and begin the work.

Step 1: Contact AES Before Trying to Purchase a Generic Report

A Title 24 report is project-specific.

It should not be treated like a standard downloadable form that can be purchased without reviewing the building.

Start by calling:

(626) 365-1518

You may also use the AES contact page.

Explain what the project involves.

Examples include:

  • New single-family construction
  • Detached ADU
  • Attached ADU
  • Garage conversion
  • Room addition
  • Second-story addition
  • Major residential remodel
  • Multifamily improvement
  • Commercial tenant improvement
  • New commercial building
  • HVAC replacement
  • Commercial lighting alteration
  • Plan-check correction
  • Revision to an existing energy report

The correct Title 24 scope depends on what the permit actually covers.

Step 2: Explain Exactly What the Project Includes

A good project description can prevent delays later.

Instead of saying only:

“Need Title 24 for remodel”

explain what is changing.

For example:

  • Adding 600 square feet of conditioned living space
  • Replacing existing windows
  • Installing a new HVAC system
  • Converting an existing garage into an ADU
  • Changing the roof and insulation
  • Remodeling a commercial tenant space with new lighting and mechanical equipment

The project scope can affect:

  • Which plans AES needs
  • Which energy calculations apply
  • Which forms may be required
  • The project price
  • The turnaround
  • Potential verification requirements

A complete project description helps AES evaluate the correct work from the beginning.

How Do I Order a Title 24 Report by submitting project plans

Step 3: Send the Current Construction Plans

Current plans are one of the most important parts of ordering a Title 24 report.

Useful documents may include:

  • Cover sheet
  • Site plan
  • Existing floor plans
  • Proposed floor plans
  • Exterior elevations
  • Building sections
  • Roof plans
  • Wall details
  • Roof and ceiling details
  • Window schedules
  • Exterior-door schedules
  • Mechanical plans
  • Electrical and lighting plans
  • Equipment schedules

Not every project will have every document.

Send what is currently available and identify which files are preliminary.

AES can review the project and explain what additional information is necessary before the calculations are finalized.

Use the Latest Plan Set When Ordering

Avoid ordering a report from drawings that you already know are obsolete.

If several versions exist, identify the current set clearly.

Useful filenames may include the project address and revision date.

Examples:

  • 123-Main-Street-Plans-2026-10-01.pdf
  • 123-Main-Street-Window-Schedule.pdf
  • 123-Main-Street-HVAC-Specifications.pdf

Avoid submitting several files named:

  • Final.pdf
  • Final-2.pdf
  • Newest-Final.pdf
  • Revision.pdf

Clear document organization reduces the chance that calculations will be based on the wrong design.

What if My Plans Are Not Finished Yet?

You can still contact AES before every detail is finalized.

Preliminary review can be useful for identifying missing information early.

However, the final report requires enough information to complete the calculations accurately.

Items that may still need to be determined include:

  • Window sizes
  • Window performance
  • Insulation values
  • Roof assemblies
  • HVAC equipment
  • Duct locations
  • Ventilation
  • Water heating
  • Commercial lighting fixtures
  • Lighting controls

Starting before permit submittal gives the project team time to resolve these issues without waiting until the last moment.

Step 4: Provide Window and Door Information

Window information can be important to the energy analysis.

Helpful information includes:

  • Window identification number
  • Width
  • Height
  • Quantity
  • Location
  • Orientation
  • U-factor
  • Solar heat gain coefficient
  • Glazed exterior doors

If final products have not been selected, tell AES.

Do not invent specifications merely to complete the order.

AES can identify which information is required before the final calculations can be completed.

How Do I Order a Title 24 Report with window and insulation information

Step 5: Provide Insulation and Building-Envelope Information

The report may need information about:

  • Exterior wall insulation
  • Continuous insulation
  • Roof insulation
  • Ceiling insulation
  • Attic configuration
  • Vaulted ceiling assemblies
  • Floor insulation
  • Floors over garages or unconditioned space
  • Roofing characteristics

The construction sections should describe the actual proposed assembly whenever possible.

A general note such as “insulate per code” may not provide enough project-specific information for the final analysis.

Step 6: Provide HVAC and Duct Information

Mechanical information can affect both the calculations and the resulting compliance forms.

AES may need:

  • Heating-system type
  • Cooling-system type
  • Number of systems
  • Equipment efficiencies
  • Heat-pump information
  • Equipment location
  • Ducted or ductless configuration
  • Duct locations
  • Duct insulation
  • Areas served by each system

If the HVAC equipment has not been selected, identify it as pending.

Do not submit outdated mechanical specifications when a different system is already planned.

Step 7: Provide Ventilation and Water-Heating Information

Depending on the project, AES may also need ventilation and water-heating details.

Ventilation information may include:

  • Whole-building ventilation
  • Local exhaust
  • Outdoor-air systems
  • Equipment specifications
  • Airflow information

Water-heating information may include:

  • Equipment type
  • Energy source
  • Efficiency
  • Storage or tankless configuration
  • Heat-pump water heating
  • Equipment location
  • Individual or central system

These systems should match the equipment ultimately shown on the construction plans.

Step 8: Provide Commercial Lighting Information When Applicable

Commercial and nonresidential projects may require lighting information such as:

  • Lighting floor plans
  • Fixture schedules
  • Fixture identification numbers
  • Fixture wattage
  • Fixture quantities
  • Room or space use
  • Occupancy sensors
  • Automatic shutoff controls
  • Daylighting controls
  • Exterior lighting information

Commercial projects may involve coordination among architects, mechanical engineers, electrical designers, lighting designers, contractors, owners, and property managers.

For related services, review Title 24 compliance services and Title 24 energy analysis.

How Do I Order a Title 24 Report for residential and commercial construction

What Happens After I Send the Plans?

AES reviews the available project information.

The review helps determine:

  • What type of project is being submitted
  • Which energy-related building components are involved
  • Whether the plans contain enough information
  • Which specifications are still missing
  • Which calculations may be required
  • Which compliance forms may apply
  • How complex the project appears
  • Whether revisions or existing corrections need to be addressed

AES may contact you with questions before the project can move into the final analysis.

This is normal.

It is better to identify missing information before calculations are completed than to discover the conflict during plan check.

What Information Might AES Request After Reviewing the Plans?

Common follow-up questions may involve:

  • Unclear conditioned floor area
  • Missing window performance values
  • Window schedules that do not match the elevations
  • Undefined insulation assemblies
  • Unclear roof construction
  • Missing HVAC efficiency information
  • Unidentified duct locations
  • Missing ventilation information
  • Undecided water-heating equipment
  • Incomplete commercial lighting schedules
  • Missing lighting-control information

The appropriate architect, designer, contractor, engineer, owner, or supplier may need to provide the answer.

When Do I Receive a Price for the Title 24 Report?

The price should reflect the actual project scope.

Pricing may depend on:

  • Project type
  • Building size
  • Complexity
  • Available documentation
  • Number of building systems
  • Requested turnaround
  • Existing Title 24 documentation
  • Required revisions
  • Existing plan-check corrections

A custom home, small ADU, commercial restaurant improvement, and lighting alteration should not automatically be expected to have the same price.

AES can provide a project-specific quote after reviewing enough information to understand the work.

Review Title 24 report pricing in California for related information.

What Should I Review Before Approving the Quote?

Before moving forward, confirm:

  • Project address
  • Project description
  • Service being provided
  • Calculation scope
  • Expected documentation
  • Turnaround information
  • Revision terms
  • Correction-response terms
  • Price
  • Payment instructions

Do not assume that unrelated services are included automatically.

Potentially separate services may include:

  • Architectural design
  • Structural engineering
  • Mechanical design
  • Electrical design
  • Permit expediting
  • Building-department fees
  • Field testing
  • HERS or other verification
  • Construction labor

The written project scope should control what AES is being hired to perform.

How Do I Order a Title 24 Report and receive a project quote

When Do I Pay for the Title 24 Report?

Payment should follow the instructions provided for the specific project.

Once service has been arranged, clients may use the AES payment page.

Do not submit an arbitrary payment before the project and amount have been confirmed.

Before paying, verify:

  • Client name
  • Project address
  • Service being purchased
  • Amount due
  • Applicable quote or invoice

Call (626) 365-1518 if you are unsure whether the project has been arranged or which amount should be paid.

What Happens After I Order the Report?

After the scope is confirmed and the project is authorized, AES can proceed with the applicable energy-compliance work.

The process generally includes:

Reviewing the Final Project Information

AES confirms the building information needed for the analysis.

Completing the Energy Calculations

The applicable building features and systems are evaluated using the appropriate compliance approach.

Identifying Required Compliance Measures

The analysis may establish energy-related measures that must remain part of the project design.

Preparing the Compliance Forms

AES prepares the applicable documentation based on the project and calculation results.

Coordinating the Report With the Plans

The energy measures should match the construction drawings submitted for permit review.

For more information about the technical analysis, review the Title 24 energy calculations page.

How Long After Ordering Does the Report Take?

Turnaround depends on the project.

Factors include:

  • Project type
  • Building size
  • Building complexity
  • Completeness of the plans
  • Availability of specifications
  • Number of unresolved design questions
  • Required revisions
  • Existing correction comments
  • Requested priority scheduling

A project with complete, coordinated information can generally proceed more efficiently than a project requiring repeated clarification.

The total calendar time may also include periods when AES is waiting for information from the project team.

Can I Order a Rush Title 24 Report?

If you have a permit deadline, tell AES when requesting the quote.

Provide:

  • The current plans
  • The complete project scope
  • The requested completion date
  • The planned permit-submittal date
  • All available specifications

Ask whether priority scheduling is available for the project.

Expedited scheduling should not be assumed until AES reviews the job and confirms availability.

A rush request also does not eliminate the need for complete project information.

How Do I Order a Title 24 Report with expedited service

How Do I Order a Residential Title 24 Report?

The ordering process begins with the residential plans and project description.

Residential projects may include:

  • New homes
  • ADUs
  • Garage conversions
  • Additions
  • Major remodels
  • Window and envelope alterations
  • HVAC-related projects

Send:

  • Floor plans
  • Exterior elevations
  • Building sections
  • Roof plans
  • Window information
  • Insulation information
  • HVAC specifications
  • Ventilation information
  • Water-heating information

AES can review what you have and identify what else is needed.

How Do I Order a Title 24 Report for an ADU?

For an ADU, identify whether the project is:

  • Detached new construction
  • Attached to the existing residence
  • A garage conversion
  • A conversion of other existing space

Helpful documents include:

  • ADU floor plans
  • Exterior elevations
  • Building sections
  • Roof plans
  • Window schedules
  • Insulation details
  • HVAC information
  • Ventilation
  • Water heating

For conversions and attached units, clearly distinguish existing construction from proposed conditioned space.

Visit the ADU Title 24 page for additional information.

How Do I Order a Report for an Addition?

For an addition, provide plans showing:

  • Existing conditioned space
  • New conditioned space
  • Existing walls
  • Removed walls
  • New exterior walls
  • New windows and doors
  • Roof and ceiling conditions
  • Existing HVAC equipment
  • New HVAC equipment or duct extensions
  • Ventilation and water-heating changes

Clearly identifying the boundary between existing and new work can make the analysis more efficient.

How Do I Order a Commercial Title 24 Report?

Commercial projects often require information from several disciplines.

Provide available:

  • Architectural plans
  • Envelope details
  • Mechanical plans
  • HVAC schedules
  • Ventilation information
  • Service water-heating information
  • Electrical plans
  • Lighting fixture schedules
  • Lighting-control plans

Commercial projects may include:

  • New commercial buildings
  • Office tenant improvements
  • Retail improvements
  • Restaurant build-outs
  • Warehouse alterations
  • Mixed-use projects
  • Commercial HVAC replacements
  • Lighting projects

Provide one coordinated set of documents whenever possible.

Can I Order a Title 24 Report if the Building Department Already Issued Corrections?

Yes.

If the project has already gone through plan check, send:

  • The complete correction notice
  • The latest architectural plans
  • The previously submitted Title 24 report when available
  • Current mechanical plans
  • Current electrical and lighting plans
  • Updated specifications
  • A summary of changes made since the previous submission

AES can review whether the project requires:

  • A new report
  • Revised calculations
  • Updated forms
  • Limited clarification
  • Plan coordination

Do not send only one copied correction sentence when the complete notice is available.

Can I Order a Revision to an Existing Title 24 Report?

Yes.

Send:

  • The existing report
  • The plans used for the original report when available
  • The current plans
  • Updated specifications
  • A written summary of what changed

A revision may be necessary when the project changes:

  • Floor area
  • Building geometry
  • Windows
  • Insulation
  • Roofing
  • HVAC equipment
  • Ventilation
  • Water heating
  • Commercial lighting
  • Overall permit scope

AES can determine whether the original report can be updated or whether a broader analysis is necessary.

What Happens if I Order the Report and Then Change the Plans?

Tell AES as soon as the design changes.

Do not wait until the building department identifies the difference.

Changes can affect:

  • Calculation results
  • Compliance measures
  • Forms
  • Verification requirements
  • Plan notes

Submitting old energy forms with revised construction drawings can create preventable plan-check corrections.

Who Can Order a Title 24 Report?

The request may come from:

  • A homeowner
  • A property owner
  • A contractor
  • An architect
  • A building designer
  • A developer
  • A property manager
  • A business owner
  • An authorized project representative

The person ordering the report does not necessarily need to be the same person who prepared the construction plans.

However, AES may need technical information from the architect, designer, contractor, engineer, or supplier before the calculations can be finalized.

How Do I Order a Title 24 Report through Alternative Energy Systems

How Can I Make the Ordering Process Faster?

Several simple steps can reduce avoidable delays.

Send One Current Plan Set

Clearly identify which plans should be used.

Describe the Entire Scope

Do not leave out parts of the project that may affect energy compliance.

Include Available Product Specifications

Provide window, insulation, mechanical, ventilation, water-heating, and lighting information.

Identify What Is Still Undecided

Tell AES when equipment or products have not been selected.

Provide the Permit Deadline

Do not wait until the end of the process to disclose an urgent schedule.

Respond to Questions Promptly

Missing information can place the project on hold until the necessary details are provided.

Report Design Changes Immediately

This helps prevent work from continuing on an outdated design.

Common Mistakes When Ordering a Title 24 Report

Avoid:

  • Sending outdated plans
  • Sending several plan versions without identifying the current one
  • Providing only a property address without plans
  • Leaving the project scope unclear
  • Providing window information that conflicts with the elevations
  • Using placeholder HVAC specifications as though they are final
  • Failing to disclose a previous Title 24 report
  • Failing to disclose existing correction comments
  • Changing the plans without notifying AES
  • Waiting until the permit-submittal deadline to begin

A clean initial submission can make the entire process easier.

Does Ordering a Title 24 Report Guarantee Permit Approval?

No.

The Title 24 report supports the energy-compliance portion of the permit application.

The complete project may also require review of:

  • Zoning
  • Architecture
  • Structural engineering
  • Fire and life safety
  • Accessibility
  • Mechanical systems
  • Electrical systems
  • Plumbing systems
  • CALGreen requirements
  • Other local requirements

The building department controls its own review and may issue correction comments.

A properly coordinated Title 24 report can reduce avoidable energy-documentation conflicts, but no consultant can guarantee the final permit decision.

Why Order Your Title 24 Report From Alternative Energy Systems?

Alternative Energy Systems provides professional energy-compliance support for homeowners, contractors, architects, designers, developers, property managers, and commercial clients throughout California.

AES brings more than 30 years of California energy-compliance experience to:

  • New residential construction
  • New commercial construction
  • ADUs and garage conversions
  • Additions and remodels
  • Multifamily improvements
  • Commercial tenant improvements
  • HVAC projects
  • Commercial lighting projects
  • Plan-check corrections
  • Revisions to existing reports and calculations

The service begins with the actual project—not a generic template.

AES reviews the plans, determines what information is needed, prepares the applicable energy analysis, and helps keep the resulting documentation coordinated with the current design.

Learn more on the About Us page or review the company’s background on the clients page.

Order a Title 24 Report for Your California Project

Call (626) 365-1518 | Alternative Energy Systems

If you are asking How Do I Order a Title 24 Report, start by contacting Alternative Energy Systems and providing the current project information.

You do not need to determine every compliance requirement yourself before calling.

AES can review your residential or commercial project and explain:

  • Which plans should be submitted
  • Which specifications are needed
  • Whether additional information is missing
  • Which energy calculations may apply
  • What the project-specific service will include
  • What the project will cost
  • What turnaround can be discussed
  • How to proceed once service is arranged

Call (626) 365-1518 or begin through the contact page.

Once the service and payment amount have been arranged, payment can be completed through the AES payment page.

For statewide information about California building energy requirements, you may also review the California Energy Commission Building Energy Efficiency Standards.

Frequently Asked Questions: How Do I Order a Title 24 Report?

How Do I Order a Title 24 Report?

Contact Alternative Energy Systems, describe the project, and send the current plans. AES can review the documents, identify missing information, define the scope, provide a project-specific quote, and explain how to proceed.

Can I order a Title 24 report online?

You can begin through the AES contact page and send project information electronically. The project still needs to be reviewed before the final scope is determined.

Can I order a report by phone?

Yes. Call (626) 365-1518 to discuss the project and ask what documents should be submitted.

What plans do I need to order a report?

Helpful documents include floor plans, elevations, sections, roof plans, window schedules, insulation details, HVAC information, water-heating information, and commercial lighting plans when applicable.

Do my plans have to be completely finished?

Preliminary review can begin with available documents, but enough information must ultimately be provided to complete accurate calculations and forms.

Can I order a report without plans?

You can contact AES and discuss the project, but project-specific calculations generally require construction plans and applicable specifications.

Do I need window specifications before ordering?

Send available information. If the windows have not been finalized, identify them as pending so AES can explain what will be needed.

Do I need HVAC specifications?

Mechanical-system information may be required depending on the project. Provide current specifications when available.

How do I order an ADU Title 24 report?

Send the ADU plans and identify whether the unit is detached, attached, or a conversion. Include window, insulation, HVAC, ventilation, and water-heating information when available.

How do I order a commercial report?

Provide the current architectural plans and applicable mechanical, electrical, lighting, ventilation, water-heating, and envelope information.

How much does it cost to order a Title 24 report?

Pricing depends on the project type, size, complexity, available documents, requested turnaround, and revision requirements. AES can provide a project-specific quote.

When do I pay?

Follow the project-specific payment instructions. When the service and amount have already been arranged, the AES payment page may be used.

Can I pay before sending plans?

The project should generally be reviewed and the service amount confirmed before payment is submitted.

How long does the report take after I order?

Turnaround depends on project complexity, plan completeness, available specifications, unresolved design questions, and revisions.

Can I request expedited service?

Tell AES your deadline and ask whether priority scheduling is available for the project.

Can I order a report after receiving plan-check corrections?

Yes. Send the complete correction notice, latest plans, previous report when available, and updated project specifications.

Can I order a revision to an existing report?

Yes. Send the previous report, current plans, and a clear summary of design changes.

Who can order the report?

Homeowners, property owners, architects, contractors, designers, developers, property managers, business owners, and other authorized project representatives may contact AES.

Does AES submit the permit application?

Do not assume complete permit submission or expediting is included unless that service has been specifically arranged. The Title 24 report supports the permit package.

Does ordering the report guarantee permit approval?

No. The building department reviews the complete permit application and controls its final decision.

What is the fastest way to get started?

Call Alternative Energy Systems at (626) 365-1518 and have the current project plans ready to submit.

Call Now Button