Where and How Can You Get a Title 24 Report?
Call (626) 365-1518 | Alternative Energy Systems
Finding the right source for California energy-compliance documentation can prevent confusion before a permit application is submitted. Where and How Can You Get a Title 24 Report is a practical question for homeowners, contractors, architects, designers, developers, property managers, and business owners preparing residential or commercial construction plans.
You can obtain a Title 24 report from an experienced California energy-compliance consultant who can review the proposed project, complete the applicable calculations, and prepare the required compliance forms. The process generally begins by submitting the current construction plans and available energy-related specifications for review.
Alternative Energy Systems provides Title 24 report services for residential, multifamily, mixed-use, and commercial permit projects throughout California. With more than 30 years of energy-compliance experience, AES helps clients identify what information is needed, resolve missing project details, and coordinate the completed documentation with the permit plans.
Call (626) 365-1518 to describe your project, request a quote, and learn which documents should be submitted first.
Where and How Can You Get a Title 24 Report in California?
A Title 24 report should be obtained from a professional who understands California energy-compliance documentation and can prepare the report around the actual project design.
The report may be ordered directly by:
- A homeowner
- A property owner
- A general contractor
- An architect
- A building designer
- A developer
- A property manager
- A commercial tenant
- Another authorized project representative
You do not necessarily need to visit an office in person to obtain the report. Project plans, specifications, correction comments, and supporting documents can typically be provided electronically for professional review.
The report should be prepared using the current plans rather than a generic property description. The consultant must understand the proposed conditioned space, building envelope, windows, insulation, mechanical systems, water heating, lighting, and other applicable energy-related features.
Alternative Energy Systems can review electronically submitted documents and prepare Title 24 compliance reports for qualifying projects across California.
For general background about the applicable standards, review what Title 24 is and the Title 24 energy code overview.
How Do You Start the Title 24 Report Process?
The process starts with a clear description of the proposed work. Before calculations can be completed, the consultant needs to understand what is being built, added, converted, replaced, or altered.
When contacting AES, explain whether the project involves:
- A new home
- A new commercial building
- An accessory dwelling unit
- A garage conversion
- A room addition
- A residential remodel
- A multifamily improvement
- A commercial tenant improvement
- An HVAC replacement
- A lighting alteration
- A plan-check correction
- A revision to an existing report
A brief project description helps AES determine which plans and specifications are likely to be required.
The next step is to submit the available documents. Preliminary plans can be reviewed, but the final report cannot be completed accurately until enough information is available to define the energy-related features of the design.
What Should You Send to Get a Title 24 Report?
The required documents depend on the project type, size, occupancy, and scope. Providing a coordinated set of plans can help the report move forward with fewer requests for clarification.
Helpful documents may include:
- Floor plans
- Exterior elevations
- Building sections
- Site plans when relevant
- Roof plans
- Roof-assembly details
- Window and exterior-door schedules
- Window manufacturer specifications
- Wall, floor, ceiling, and roof insulation notes
- Heating and cooling equipment specifications
- Duct-location information
- Mechanical ventilation details
- Domestic water-heating specifications
- Commercial lighting fixture schedules
- Commercial lighting-control plans
- Mechanical and electrical drawings
- Existing building-department correction comments
Not every document must be complete before you contact AES. The available plans can be reviewed first, and AES can explain which missing details are needed before the calculations are finalized.
Before sending your files, review what AES will need from you.
How Is a Title 24 Report Ordered?
Ordering a Title 24 report generally involves a series of practical steps rather than a single form submission.
1. Contact an Energy-Compliance Consultant
Call Alternative Energy Systems at (626) 365-1518 or use the contact page to describe the project.
Provide the property type, proposed scope, current design stage, permit jurisdiction, and desired schedule.
2. Submit the Current Plans
Send the latest plan set rather than an outdated or superseded version. Clearly identify whether the documents are preliminary, permit-ready, or already under building-department review.
3. Provide Energy-Related Specifications
Include available information for windows, insulation, roofing, HVAC equipment, ventilation, water heating, lighting, and controls.
The exact information required will vary according to the project.
4. Allow the Documents to Be Reviewed
AES evaluates the submitted materials to determine the report scope, identify missing information, and estimate the work required.
5. Receive a Quote and Project Instructions
Pricing depends on the building type, project size, complexity, available documentation, requested turnaround, and whether revisions or correction responses are involved.
6. Resolve Missing Design Information
The report may require additional product data, equipment specifications, construction details, or clarification from the architect, designer, contractor, or owner.
7. Complete the Energy Analysis
The project information is evaluated under the applicable compliance method. The analysis addresses the energy-related characteristics of the proposed design.
8. Prepare the Compliance Forms
Once the calculations are complete, the applicable forms are generated for coordination with the permit plans.
9. Review the Report Against the Drawings
The project team should confirm that the energy measures shown in the report are represented accurately throughout the current plan set.
10. Submit the Coordinated Permit Package
The completed forms can then be included with the other required permit documents for review by the applicable building department.
Can You Get a Title 24 Report Online?
The documents needed to prepare a Title 24 report can generally be submitted electronically. This allows homeowners, contractors, architects, designers, and commercial clients to obtain professional assistance without relying on an in-person appointment.
Digital project files may include:
- PDF plan sets
- Window schedules
- Product specification sheets
- Mechanical equipment data
- Lighting schedules
- Building-department correction notices
- Revised drawings
Electronic service does not mean the report should be automated from a few basic property details. A reliable report still requires professional review of the actual project scope and relevant construction information.
AES can review electronically submitted plans, communicate about missing details, prepare the applicable analysis, and provide completed documentation for coordination with the permit set.
Can You Get a Title 24 Report From the Building Department?
The building department reviews permit documentation, but it does not typically prepare the applicant’s project-specific energy analysis.
The property owner or project team is generally responsible for obtaining the required report and submitting it with the other permit documents.
The building department may:
- Identify whether energy documentation is required for a submittal
- Review the submitted report and forms
- Compare the forms with the construction plans
- Issue correction comments
- Request revised or additional documentation
The energy consultant prepares the project-specific report. The jurisdiction then evaluates that documentation as part of its plan-review process.
Because requirements and submittal procedures can vary by jurisdiction and project scope, applicants should follow the instructions provided by the applicable building department.
Who Can Prepare a Title 24 Report?
A Title 24 report should be prepared by a professional who understands California energy-compliance analysis, the applicable documentation, and the need to coordinate the report with the actual plans.
The consultant should be able to:
- Review the proposed project scope
- Identify relevant energy features
- Recognize missing or conflicting information
- Complete the applicable calculations
- Prepare the required compliance forms
- Explain which measures must appear in the plans
- Revise the documentation when the design changes
- Assist with energy-related correction comments
Price alone should not be the only consideration when selecting a provider. An incomplete or poorly coordinated report may require additional revisions and can create confusion during permit review.
Alternative Energy Systems has more than 30 years of experience preparing California energy-compliance documentation for multiple project types.
Learn more about the company on the About Us page or review its professional background on the clients page.
Where and How Can You Get a Residential Title 24 Report?
A residential Title 24 report can be obtained by submitting the home or residential project plans to an energy-compliance consultant.
Residential projects that may require a report include:
- New single-family homes
- New multifamily buildings
- Accessory dwelling units
- Garage conversions
- Room additions
- Major residential remodels
- Qualifying window alterations
- HVAC changes
- Roofing or insulation projects
- Other permitted work affecting energy-related components
Residential analysis may address:
- Conditioned floor area
- Building orientation
- Wall and ceiling insulation
- Roof characteristics
- Floor insulation when applicable
- Window area and performance
- Exterior doors
- Heating and cooling equipment
- Duct location
- Ventilation
- Domestic water heating
- Applicable residential lighting measures
To begin, send the latest residential plans and the available specifications for these components. AES can identify what is missing and explain the next step.
Where Can You Get a Title 24 Report for an ADU?
Alternative Energy Systems can prepare energy-compliance documentation for qualifying detached ADUs, attached ADUs, and garage conversions.
Submit:
- The ADU floor plan
- Exterior elevations
- Building sections
- Roof details
- Window and door schedules
- Insulation information
- HVAC specifications
- Ventilation information
- Water-heating details
A detached ADU may be evaluated as an independent residential structure. An attached ADU or garage conversion may require clearer documentation of the relationship between existing and proposed construction.
Visit the ADU Title 24 page for related information.
How Do You Get a Report for an Addition or Remodel?
Submit plans that clearly separate the existing building from the proposed work. The documentation should identify new conditioned space and any changes to walls, roofing, windows, insulation, HVAC equipment, ventilation, or water heating.
The report can be prepared once the consultant has enough information to evaluate the applicable portion of the project.
Where and How Can You Get a Commercial Title 24 Report?
A commercial Title 24 report can be obtained from a California energy-compliance consultant who handles nonresidential building requirements.
Projects that may require commercial documentation include:
- New commercial buildings
- Office tenant improvements
- Retail build-outs
- Restaurant improvements
- Warehouse alterations
- Mixed-use projects
- Commercial HVAC replacements
- Interior lighting alterations
- Exterior lighting projects
- Multifamily common-area improvements
Commercial analysis may address:
- Building-envelope performance
- Mechanical equipment efficiency
- Ventilation
- Service water heating
- Lighting power
- Interior lighting controls
- Exterior lighting controls
- Other nonresidential compliance measures
To order the report, provide the architectural plans and the available mechanical, electrical, lighting, and equipment information.
Commercial reports often require coordination among several design disciplines. AES can review the documents to determine whether the plans and schedules contain the details needed for the analysis.
For related services, review Title 24 compliance services and Title 24 energy analysis.
How Early Should You Get a Title 24 Report?
The report should generally be requested after the project has enough detail to identify the building envelope and major systems, but before the permit plans are considered final.
Starting early provides time to resolve questions involving:
- Window area and performance
- Insulation assemblies
- Roof characteristics
- HVAC equipment
- Duct location
- Ventilation
- Water heating
- Commercial lighting
- Lighting controls
Waiting until the planned submittal date can create problems when required information is incomplete. The consultant may need specifications that the project team has not yet selected or shown in the plans.
Early review can also identify conflicts before they become embedded throughout the construction documents.
How Long Does It Take to Get a Title 24 Report?
Turnaround time depends on the project type, size, complexity, quality of the plans, and completeness of the submitted specifications.
Factors that may affect timing include:
- Whether the plans are preliminary or permit-ready
- The size and geometry of the building
- The number of systems being evaluated
- Whether window information is complete
- Whether HVAC equipment has been selected
- Whether commercial lighting schedules are available
- Whether conflicting information must be resolved
- Whether the project already has correction comments
- How quickly requested information is provided
A coordinated project can generally move more efficiently than one with missing specifications or repeated design changes.
Call (626) 365-1518 to discuss the anticipated turnaround for your project.
How Much Does It Cost to Get a Title 24 Report?
The cost depends on the project type, square footage, complexity, available documentation, turnaround needs, and whether revisions are expected.
A small residential project with complete plans may require a different level of work than a custom home, multifamily development, restaurant improvement, or commercial building.
Information that can help AES provide a project-specific quote includes:
- A description of the proposed work
- The current plan set
- The property type
- The permit jurisdiction
- The desired schedule
- Existing plan-check comments
- Known design changes
- Whether a previous report exists
Review Title 24 report pricing in California or call (626) 365-1518 for a quote.
Can You Get a Title 24 Report Before the Plans Are Finished?
Preliminary plans can be reviewed before every detail has been finalized. This early review can help identify what must be added before the report is completed.
However, the final calculations require enough information to accurately represent the proposed project.
Items that may need to be resolved include:
- Final conditioned floor area
- Window sizes and performance values
- Wall and roof assemblies
- Insulation levels
- HVAC equipment
- Ventilation systems
- Water-heating equipment
- Commercial lighting fixtures
- Lighting-control requirements
When these details remain undecided, AES can explain what information will eventually be required. This gives the design team an opportunity to coordinate the necessary choices before the report is finalized.
Can You Get a Title 24 Report After Plan-Check Corrections?
Yes. If the building department issues corrections requesting energy documentation or identifying problems with an existing report, AES can review the comments and current plans.
Provide:
- The complete correction notice
- The latest architectural plan set
- Current mechanical and electrical drawings
- Updated window and insulation information
- Current HVAC specifications
- Revised lighting information when applicable
- A summary of changes made since the previous submittal
The complete correction notice should be submitted rather than an isolated sentence. The surrounding comments may provide important context about the requested revision.
A Title 24 report should remain consistent with the current project plans throughout permit review.
Call (626) 365-1518 to request assistance with energy-related correction comments.
Can You Get an Existing Title 24 Report Revised?
An existing report may need to be revised when the project design changes.
Changes that may require review include:
- Increasing or decreasing conditioned floor area
- Changing window sizes
- Changing window performance ratings
- Revising insulation assemblies
- Changing roof characteristics
- Selecting different HVAC equipment
- Relocating ducts
- Changing ventilation systems
- Replacing water-heating equipment
- Revising commercial lighting fixtures
- Changing lighting controls
- Expanding or reducing the project scope
Send the latest plan set and clearly identify what changed. The original report can then be reviewed to determine whether updated calculations or forms are needed.
Submitting an outdated report with revised plans can result in discrepancies during plan check and confusion during construction.
Does Getting a Title 24 Report Include HERS Testing?
The Title 24 report may identify residential measures that require field verification, but the report and HERS-related field testing are separate services.
The energy consultant prepares the analysis and applicable forms. Required field verification is completed separately by the appropriate professional.
Whether additional verification applies depends on factors such as:
- The project scope
- The mechanical design
- Duct conditions
- Equipment selections
- The selected compliance path
The completed report can help the contractor and property owner understand whether additional testing or documentation may be expected during construction.
For more context about related code topics, review Title 24 vs. CALGreen.
What Happens After You Get the Report?
After the report is completed, it should be coordinated with the current construction plans.
The project team should verify that the plans and report agree on:
- Conditioned floor area
- Window sizes and performance
- Insulation levels
- Roof characteristics
- HVAC equipment
- Duct location
- Ventilation
- Water-heating equipment
- Commercial lighting and controls
The coordinated documents can then be submitted to the building department.
During plan review, the jurisdiction may accept the documentation or request clarification and revisions. The report should also remain available during construction because contractors and inspectors may need to reference the approved energy measures.
Why Choose Alternative Energy Systems?
Alternative Energy Systems provides professional Title 24 report services for homeowners, contractors, architects, designers, developers, property managers, and commercial clients throughout California.
AES has more than 30 years of experience preparing energy-compliance documentation for:
- New residential construction
- New commercial buildings
- ADUs and garage conversions
- Room additions
- Residential remodels
- Multifamily improvements
- Commercial tenant improvements
- HVAC and lighting projects
- Plan-check corrections
- Revisions to existing reports
AES reviews the actual project information rather than relying on a generic description. The goal is to prepare documentation that reflects the proposed construction and can be coordinated meaningfully with the permit plans.
Clients can submit project documents electronically, receive guidance about missing information, and work directly with AES throughout the report-preparation process.
Order a Title 24 Report for Your Project
Call (626) 365-1518 | Alternative Energy Systems
Knowing Where and How Can You Get a Title 24 Report allows you to take the next step before missing energy documentation affects your permit schedule.
Alternative Energy Systems can review your project scope, examine the available plans, identify missing specifications, prepare the applicable energy analysis, and provide compliance forms for coordination with the permit set.
Call (626) 365-1518 to:
- Describe your residential or commercial project
- Ask which documents should be submitted
- Request a project-specific quote
- Discuss turnaround requirements
- Request help with plan-check corrections
- Update an existing report after design changes
You may also submit project information through the contact page. If service has already been arranged, payment can be completed through the AES payment page.
- Phone: (626) 365-1518
- Email: info@title24energy.com
- Payment: AES Payment
Do not wait until the planned permit-submittal date to find out that essential energy documentation is missing. Call Alternative Energy Systems at (626) 365-1518 and request professional assistance with your Title 24 report.
Frequently Asked Questions: Where and How Can You Get a Title 24 Report?
Where and How Can You Get a Title 24 Report?
You can get a Title 24 report from an experienced California energy-compliance consultant. Contact Alternative Energy Systems, describe the project, submit the current plans, and provide the requested energy-related specifications.
Can I order a Title 24 report online?
Project plans and supporting documents can generally be submitted electronically. AES can review digital files and communicate with the project team about missing information.
Do I need to visit an office?
An in-person appointment is not generally necessary when the required plans and specifications can be provided electronically.
Can the building department prepare the report?
The building department reviews permit documentation but does not typically prepare the applicant’s project-specific energy report. The property owner or project team must obtain the required documentation.
Who can request a Title 24 report?
A homeowner, contractor, architect, designer, developer, property manager, business owner, or authorized project representative can request a report.
What should I send first?
Start with the current floor plans, elevations, sections, roof plans, window schedule, insulation notes, HVAC information, water-heating details, and commercial lighting documents when applicable.
Can I request a report with preliminary plans?
Yes. Preliminary plans can be reviewed, but enough information must be available before the final calculations and forms can be completed.
How long does it take to get the report?
Timing depends on the project type, complexity, plan quality, available specifications, and how quickly missing information is supplied. Call (626) 365-1518 to discuss the schedule.
How much does a Title 24 report cost?
Pricing depends on the project size, building type, complexity, documentation, turnaround, and whether corrections or revisions are involved. Call (626) 365-1518 for a project-specific quote.
Can I get a report for an ADU?
Yes. AES can prepare energy-compliance documentation for qualifying detached ADUs, attached ADUs, and garage conversions.
Can I get a commercial Title 24 report?
Yes. AES assists with commercial buildings, tenant improvements, retail spaces, restaurants, offices, lighting projects, mechanical alterations, and other nonresidential work.
Can an existing report be revised?
Yes. A revision may be required when the plans, windows, insulation, roofing, HVAC equipment, water heating, lighting, floor area, or another energy-related feature changes.
Can AES respond to plan-check corrections?
AES can review the complete correction notice and current plans to determine whether the energy calculations, forms, or plan notes require revision.
Does the report guarantee permit approval?
No. The report supports the energy-compliance portion of the permit application, but the complete project remains subject to review by the applicable building department.
How do I get started?
Call Alternative Energy Systems at (626) 365-1518, describe the proposed work, and submit the available plans. AES can review the project and explain the next steps.







