What Software Is Used to Create Title 24 Reports?
A Title 24 report may look like a collection of forms and technical figures, but behind those pages is a detailed building model that must accurately represent the proposed construction. This leads many homeowners, contractors, architects, and developers to ask: What Software Is Used to Create Title 24 Reports for California permit applications?
The direct answer is that performance-based Title 24 reports must be prepared with compliance software approved by the California Energy Commission for the applicable Energy Code cycle, building occupancy, and project scope. For projects governed by the 2025 Energy Code, approved programs include California Building Energy Code Compliance software, commonly called CBECC, along with approved third-party programs such as EnergyPro, IES VE, and Right-Energy.
These programs are not interchangeable in every situation. One application may be approved for single-family, multifamily, and nonresidential projects, while another may be limited to new single-family construction or new nonresidential buildings. The selected program and version must match the actual permit project.
Title24Energy.com removes the guesswork by reviewing your plans, identifying the applicable compliance pathway, and using appropriate California Energy Commission-approved software for the project. Call or text (626) 365-1518 to discuss your plans before permit submission instead of trying to figure out What Software Is Used to Create Title 24 Reports.
What Software Is Used to Create Title 24 Reports Under the 2025 Energy Code?
Permit applications submitted on or after January 1, 2026, generally must use compliance software and forms approved for the 2025 Energy Code. The approved program must also support the building classification and construction scope being modeled.
The principal software choices currently include:
- CBECC: California’s public-domain compliance software for applicable single-family, multifamily, and nonresidential projects
- EnergyPro: Third-party compliance software approved for applicable single-family, multifamily, and nonresidential projects
- IES VE Title 24: Approved for qualifying new nonresidential construction
- Right-Energy Title 24: Approved for qualifying new single-family residential construction
Approved versions can change as programs are updated, replaced, corrected, or allowed to expire. A professional consultant should therefore confirm the current California Energy Commission approval list at the time the energy model is prepared rather than relying on the name of a program alone.
CBECC Compliance Software
CBECC stands for California Building Energy Code Compliance. It is the public-domain software developed for demonstrating performance compliance with California’s residential, multifamily, and nonresidential energy standards.
The current CBECC platform can be used for applicable:
- Single-family residential buildings
- Low-rise multifamily buildings
- Nonresidential buildings
- New construction
- Additions
- Alterations supported by the approved version
CBECC creates a proposed building model based on the project information entered by the energy consultant. It then evaluates that design under the applicable Energy Code rules and compares it with the standard design established for compliance purposes.
Because CBECC is publicly available, someone may assume that downloading the program is all that is needed to produce a permit-ready report. In reality, the quality of the result depends on the accuracy of the model. Floor area, orientation, glazing, insulation, mechanical systems, ventilation, water heating, solar features, battery systems, and project scope must all be entered and classified correctly.
EnergyPro
EnergyPro is third-party compliance software approved for applicable single-family, multifamily, and nonresidential performance modeling. It is widely used by energy consultants because it can support different building types and provide a professional workflow for preparing energy-compliance calculations and forms.
EnergyPro may be appropriate for:
- New homes and residential additions
- Accessory dwelling units
- Residential alterations
- Low-rise multifamily projects
- Commercial buildings
- Tenant improvements
- Mixed project scopes supported by the approved version
The program name by itself does not make every report valid. The installed version must be approved for the applicable code cycle and scope. The consultant must also model the project accurately and coordinate the output with the permit drawings.
IES VE Title 24
IES Virtual Environment Title 24 is an approved third-party option for qualifying new nonresidential construction under the 2025 Energy Code. It may be useful for advanced commercial building analysis where the project team is already working within a detailed whole-building simulation environment.
Its approval is limited to the occupancies and project scopes identified by the California Energy Commission. It should not be selected automatically for a residential addition, remodel, or other project outside its approved use.
Right-Energy Title 24
Right-Energy Title 24 is an approved third-party program for qualifying new single-family residential construction. Its approval does not automatically extend to every residential addition, alteration, multifamily development, or commercial project.
This is an important example of why the answer to What Software Is Used to Create Title 24 Reports depends on more than personal preference. The selected program must be authorized for the exact project category being submitted.
What Happened to CBECC-Res and CBECC-Com?
Older Title 24 reports and online resources often refer to CBECC-Res for residential projects and CBECC-Com for commercial or nonresidential modeling. Those names remain relevant when discussing earlier Energy Code cycles, archived reports, and older permit applications.
For the 2025 Energy Code, the California Energy Commission’s current approved-software list uses the unified CBECC name for applicable single-family, multifamily, and nonresidential projects. A report created under an earlier code cycle may still display the older program name because it was prepared using the software approved when that permit was submitted.
Do not attempt to update an old project simply by opening its files in a newer program. Changes between code cycles can affect modeling rules, mandatory measures, standard-design assumptions, forms, software inputs, and report output. The project should be reviewed under the code cycle that applies to its permit.
The Importance of CEC-Approved Software
The performance method allows a proposed building to be evaluated as an integrated energy system. Instead of checking only a fixed list of individual component values, approved software compares the proposed design with a standard design established by the Energy Code.
This flexibility can be valuable when a project includes architectural features that do not fit neatly within a basic prescriptive package. Improved performance in one qualifying area may help offset another design choice, subject to mandatory requirements and the modeling rules.
California regulates this process because different programs must produce consistent and dependable compliance results. The California Energy Commission establishes approval procedures, simulation rules, reporting requirements, and limits on the occupancies or scopes supported by each program.
Generic energy calculators, spreadsheets, load-calculation programs, architectural drafting software, and general building-simulation tools do not become approved Title 24 performance software merely because they can estimate energy use.
Approved Software Must Match the Code Cycle
A program approved for the 2022 Energy Code should not be used to demonstrate performance compliance for a permit governed by the 2025 Energy Code. Likewise, a newly approved version should not automatically be substituted into an older permitted project without confirming the enforcement agency’s requirements.
The permit application date is therefore one of the first details that should be established before modeling begins.
Approved Software Must Match the Occupancy
Single-family, low-rise multifamily, high-rise multifamily, hotel, motel, and nonresidential buildings can be subject to different compliance rules and documentation categories. The selected software must support the project’s correct classification.
Approved Software Must Match the Construction Scope
A program may be approved for new construction but not for additions or alterations. The energy consultant must verify whether the software is authorized for:
- Newly constructed buildings
- Additions to existing buildings
- Alterations to existing buildings
- The specific occupancy being modeled
Selecting a familiar program without confirming these limitations can lead to invalid output or a permit package that the building department cannot accept.
Prescriptive Forms Versus Performance Software
Not every project requires a full computer performance model. California permits can demonstrate compliance through either the prescriptive method or the performance method when the applicable standards permit that choice.
Prescriptive Compliance
The prescriptive method follows specified requirements for individual building components and systems. A project may demonstrate that its insulation, windows, HVAC equipment, water heating, lighting, controls, and other features satisfy the applicable prescriptive criteria.
Some prescriptive forms can be completed without creating a complete performance simulation. Online form tools and fillable compliance documents may assist with form preparation, but those resources should not be confused with approved performance-modeling software.
Performance Compliance
The performance method uses approved computer software to evaluate the proposed design against the standard design. It can provide greater design flexibility, but it requires careful building modeling and accurate project data.
Performance modeling may be useful when:
- The project does not fit a straightforward prescriptive package
- The design relies on efficiency trade-offs
- Window area or orientation affects compliance
- Several building systems must be evaluated together
- The project team wants to compare potential design options
- The applicable permit documents require a performance certificate
The choice between prescriptive and performance compliance should be made based on the actual plans, code requirements, and design objectives—not simply on which software appears easiest to operate.
What Information Is Entered Into Title 24 Software?
Approved software is only as reliable as the information entered into it. Preparing a professional model requires the consultant to study the drawings and translate the proposed construction into a technically accurate digital representation.
Project and Site Information
The model may include:
- Project address
- Permit scope
- Applicable Energy Code cycle
- Building occupancy
- California climate zone
- Building orientation
- Existing and proposed construction
- Conditioned and unconditioned areas
Building Geometry
The software may require detailed information about:
- Conditioned floor area
- Number of stories
- Ceiling heights
- Wall dimensions
- Roof and ceiling areas
- Floor and slab areas
- Window and exterior-door sizes
- Window orientation
- Adjacency to outdoor, ground, attic, garage, or other spaces
A small geometry error can affect wall area, glazing percentage, heating and cooling loads, and the calculated energy result.
Envelope Assemblies
The consultant may enter:
- Wall construction
- Roof and ceiling assemblies
- Floor and slab assemblies
- Insulation type and value
- Framing characteristics
- Cool-roof information
- Window U-factor
- Window solar heat gain coefficient
- Exterior-door performance
- Air-sealing features
Mechanical and Ventilation Systems
The model may also include:
- Heating and cooling equipment type
- Equipment efficiency
- System capacity
- Heat-pump characteristics
- Duct location and insulation
- Duct leakage assumptions
- Thermostat and control features
- Whole-building ventilation
- Local exhaust systems
- Economizers for applicable nonresidential systems
Water Heating, Solar, and Battery Systems
Depending on the project, the report may evaluate:
- Water-heater type and efficiency
- Fuel source
- Distribution design
- Recirculation systems
- Solar photovoltaic capacity
- Battery-storage features
- Electric-ready measures
Lighting and Commercial Systems
Applicable nonresidential models may include lighting power, space use, control systems, daylighting zones, outdoor lighting, electrical distribution, mechanical controls, refrigeration, and other covered processes.
This is why a set of complete, coordinated plans produces a better report than an informal description of the project.
How Software Turns Plans Into a Title 24 Report
The software does not read a plan set and make every decision automatically. A trained user must review the documents, classify the construction correctly, select the appropriate inputs, and examine the results for conflicts or unreasonable assumptions.
Step 1: Review the Permit Scope
The consultant determines what is being built, added, converted, replaced, or altered. This establishes which portions of the building must be included and which code provisions are likely to apply.
Step 2: Confirm the Code Cycle and Building Type
The permit date, occupancy, number of stories, dwelling configuration, and proposed use help determine which forms and software options are appropriate.
Step 3: Build the Digital Model
The architectural geometry, envelope assemblies, glazing, mechanical equipment, ventilation, water heating, lighting, solar features, and other applicable systems are entered into the program.
Step 4: Run the Compliance Analysis
The software applies the approved modeling rules and compares the proposed design with the applicable standard design. The results help identify whether the project complies under the selected performance pathway.
Step 5: Resolve Design Conflicts
If the design does not comply, the project team can review potential adjustments. Depending on the project, these may involve insulation, windows, equipment efficiency, duct design, ventilation, water heating, lighting, solar features, or another regulated component.
Step 6: Generate the Compliance Documents
Once the model accurately represents a compliant design, the appropriate performance certificates and supporting output can be generated for coordination with the permit plans.
Step 7: Review the Forms Against the Drawings
The final step is critical. Floor area, window values, insulation, equipment, lighting, and other specifications should be checked against the latest plan revision before the report is submitted.
How the Correct Software Can Support Permit Approval
The right program does not guarantee approval by itself, but it gives the consultant an authorized platform for preparing the required performance analysis. Professional judgment is still needed to create a model that accurately reflects the proposed building.
Using suitable software can help the project team:
- Select the correct compliance pathway
- Evaluate building-envelope performance
- Compare window and insulation options
- Coordinate mechanical-system efficiency
- Identify required verification measures
- Document applicable solar and battery features
- Generate project-specific compliance certificates
- Respond to energy-related plan-check corrections
The goal is not merely to make the software display a passing result. The goal is to produce a defensible permit package that matches the construction documents and can be followed in the field. If you’re still trying to figure out What Software Is Used to Create Title 24 Reports, then waste no more time. Simply give us a call and we’ll help you get started.
Common Software and Modeling Mistakes
Many report problems are caused by user input, project classification, or plan coordination rather than a defect in the approved software.
Using the Wrong Code Cycle
A report created under an earlier Energy Code may not be valid for a new permit application. The consultant should confirm the applicable cycle before beginning the model.
Using an Expired or Unapproved Version
Software versions can be updated or allowed to expire. The current approval status should be checked when the report is prepared and again if a project remains inactive for an extended period.
Selecting the Wrong Occupancy
Modeling a multifamily or nonresidential building as a single-family residence can apply the wrong assumptions, forms, and requirements.
Entering Incorrect Floor Area
Garages, covered patios, unconditioned storage areas, existing rooms, additions, and converted spaces must be classified correctly. An inaccurate conditioned floor area can materially affect the result.
Modeling Windows Incorrectly
Window quantity, size, orientation, U-factor, and solar heat gain coefficient should match the plans and product schedule.
Using Placeholder Equipment That Never Gets Updated
Preliminary equipment assumptions may become inconsistent with the final mechanical schedule. The report should be updated when the selected system differs from the modeled system.
Ignoring Plan Revisions
Changes to room dimensions, ceiling heights, windows, insulation, HVAC, water heating, lighting, or solar design can require revisions to the energy model.
Treating a Passing Result as the Only Quality Check
A model can produce a passing result and still describe the wrong building. The report must be reviewed for accuracy, internal consistency, and agreement with the drawings.
Can Homeowners or Contractors Use Title 24 Software?
Some compliance programs are publicly available, and a homeowner, contractor, or designer may be able to download and operate them. Access to the software, however, does not replace knowledge of the Energy Code or experience interpreting construction plans.
A first-time user must learn how to:
- Determine the correct project classification
- Select the applicable code cycle
- Model building geometry
- Define envelope assemblies
- Enter mechanical and ventilation systems
- Interpret compliance results
- Recognize unreasonable default assumptions
- Generate the appropriate documents
- Coordinate the forms with the plans
- Respond to plan-check corrections
A project with incomplete drawings or unusual design conditions can be especially difficult to model. Paying for professional preparation may cost less than losing time to rejected forms, incorrect product selections, repeated revisions, or a permit package that does not match the intended construction.
Software Does Not Replace Professional Plan Review
Energy-compliance software performs calculations based on the information supplied by the user. It does not independently verify that the window schedule matches the elevations, that the mechanical equipment is available, or that the proposed assemblies can be constructed as drawn.
A professional report should include a reasoned review of:
- The permit scope
- The latest plan revision
- Existing versus proposed construction
- Conditioned versus unconditioned space
- Architectural dimensions
- Window specifications
- Envelope details
- Mechanical equipment
- Ventilation requirements
- Water-heating systems
- Lighting and controls when applicable
- Required installation and verification documents
For more information about who may prepare the calculations and documents, review who can legally prepare a Title 24 report in California.
How Title24Energy.com Selects the Appropriate Software
Title24Energy.com begins with the project rather than forcing every design into the same modeling program. The online remote process allows plans to be reviewed digitally for projects throughout California.
We Identify the Applicable Project Category
The building occupancy, permit scope, number of stories, conditioned floor area, and proposed use are reviewed to determine whether the project is single-family, multifamily, nonresidential, or another applicable category.
We Confirm the Energy Code Cycle
The permit application date and available project information are used to identify the likely code cycle. This helps prevent calculations from being started in software intended for the wrong standards.
We Review the Compliance Pathway
The project is evaluated to determine whether prescriptive documentation may be sufficient or whether performance modeling offers the appropriate path.
We Select Approved Software for the Scope
When performance modeling is required, the selected program must be approved for the project’s occupancy, construction scope, and Energy Code cycle.
We Coordinate the Output With the Plans
The resulting forms are reviewed against the available project information so discrepancies can be addressed before permit submission.
We Support Necessary Revisions
If the plans change or the building department issues energy-related corrections, the affected model inputs and documents can be reviewed using the latest information.
What to Submit for a Software-Based Title 24 Report
A complete plan set allows the energy consultant to model the project with fewer assumptions. Send the following items when available:
- Project address
- Permit application date or intended submission date
- Detailed scope of work
- Dimensioned floor plans
- Elevations
- Building sections
- Door and window schedules
- Wall, roof, ceiling, floor, and slab details
- Insulation specifications
- Mechanical plans or equipment information
- Ventilation information
- Water-heating specifications
- Lighting plans for applicable nonresidential projects
- Solar and battery information when applicable
- Existing plan-check corrections
Applicants who need a broader explanation of the forms generated during the process can review the Title 24 Compliance Documentation Requirements Guide.
Wondering What Software Is Used to Create Title 24 Reports? Get the Right Software and the Right Report
Knowing What Software Is Used to Create Title 24 Reports is valuable, but selecting a program is only the beginning. The software must be approved for the correct Energy Code cycle, occupancy, and scope. The model must accurately represent the building, and the final documents must agree with the permit plans.
Title24Energy.com handles that technical process for you. Whether your project involves a new home, accessory dwelling unit, room addition, garage conversion, multifamily development, commercial building, or tenant improvement, we can review the plans and identify the appropriate path forward.
Call or text (626) 365-1518 to request a project review. You can also submit the latest plans through the Title24Energy.com contact page.
Still trying to figure out What Software Is Used to Create Title 24 Reports? Do not spend valuable permit time experimenting with the wrong software or outdated forms. Put the project in experienced hands and move forward with coordinated, permit-focused energy documentation.
About California’s Energy Standards
The regulations commonly called Title 24 are part of the California Energy Code. The standards establish energy-efficiency requirements for applicable residential and nonresidential construction throughout the state.
Because software approvals and technical requirements can change between code cycles, every new report should be prepared using current project information and the tools authorized for that permit.
Frequently Asked Questions About Title 24 Software
Which programs are approved for the 2025 Energy Code?
The current approved list includes CBECC and qualifying versions of EnergyPro, IES VE Title 24, and Right-Energy Title 24. Approval limits vary by occupancy and construction scope.
Is CBECC free to use?
CBECC is California’s public-domain compliance software. Although the program is publicly available, preparing a correct permit model still requires technical Energy Code and construction-plan knowledge.
Is EnergyPro approved for California permits?
Approved EnergyPro versions can be used for qualifying projects under the code cycles, occupancies, and scopes identified by the California Energy Commission.
Can I still use CBECC-Res?
CBECC-Res applies to certain earlier code-cycle reports and archived projects. The current 2025 approval list uses the CBECC name for applicable single-family, multifamily, and nonresidential modeling.
Can commercial projects use residential software?
No. The software must be approved for the correct occupancy. A single-family-only program should not be used for a commercial building.
Can one program model every type of project?
Not necessarily. Some programs support several occupancies and scopes, while others are approved only for specific project categories.
Does every project require performance software?
No. Some projects can demonstrate compliance using the applicable prescriptive requirements and forms without creating a complete performance model.
Can a spreadsheet create an official performance report?
No. A spreadsheet or generic calculator is not a substitute for software approved to demonstrate performance compliance under the applicable Energy Code.
Does the program automatically read architectural plans?
No. A user must interpret the plans and enter the building geometry, assemblies, systems, and other project details into the compliance model.
Can homeowners prepare their own calculations?
Publicly available software can be accessed by homeowners, but the technical learning curve and risk of modeling errors make professional preparation practical for many permit applicants.
Does the software determine whether my plans are complete?
No. It calculates compliance from the entered data. A separate plan review is needed to identify missing information and inconsistencies between the report and drawings.
Why does the software version matter?
Approval applies to specific versions and code cycles. An outdated or expired version may not be accepted for a new permit application.
Can an old report be converted to the current code?
It may need to be recreated or substantially revised. New code cycles can change forms, modeling rules, standard-design assumptions, and mandatory requirements.
Which software is best for an ADU?
The correct option depends on whether the ADU is detached, attached, converted from existing space, or part of a larger project, as well as the applicable code cycle and compliance pathway.
Does the software include solar and battery modeling?
Approved programs include applicable methods for evaluating regulated solar photovoltaic and battery features when those measures are part of the project’s compliance analysis.
What happens when a model fails?
The project team can review compliant design adjustments involving the envelope, glazing, equipment, water heating, lighting, solar features, or other applicable measures.
Can a passing model still receive corrections?
Yes. The building department may issue corrections when the forms conflict with the plans, required information is missing, or the selected software does not match the project.
What files should I send for modeling?
Send the latest floor plans, elevations, sections, window schedule, envelope details, mechanical information, and other specifications relevant to the proposed work.
Can the report be prepared remotely?
Yes. Title24Energy.com reviews digital plans and prepares energy-compliance documentation through an online remote process for California projects.
How do I start the report process?
Call or text (626) 365-1518 or submit the current plans through the contact page for review.




